VIRGIL / PUBLISHED OPERATIONAL REFINEMENTTRACE QUALIFICATION AND GUIDED EXECUTION RECONSTRUCTION

VIRGIL determines what execution reconstruction the qualified record legitimately permits at the resolution required by the governance claim.

01 / OPERATIONAL ARCHITECTURE

Qualification precedes reconstruction. Reconstruction precedes attribution.

The operational sequence keeps evidence qualification, factual reconstruction, and governance attribution in their proper analytical order. ArbiterSTG remains in the theoretical lineage rather than the client workflow.

02 / RESOLUTION-SENSITIVE RECONSTRUCTION

Preserve the distinction the governance claim actually turns on.

VIRGIL descends only far enough to separate execution states the claim treats as non-equivalent, and only as far as qualified trace permits.

CLAIM-RELEVANT DISTINCTION(S)Which difference in the realized sequence could change the downstream governance attribution?
NON-EQUIVALENCE BASISWhy does the claim treat those execution states as materially different?
01Claim-Relevant State Before

The last supported execution state before the distinction becomes material.

02Operative Resolution Basis

The qualified trace and temporal relation that permit the distinction.

03Claim-Relevant State After

The supported state after the distinction, with unresolved relations preserved.

STOPPING RULE

Stop subdivision when further variation no longer changes a distinction treated as non-equivalent by the claim under review.

03 / QUALIFIED PROPOSITIONS

The proposition is the atomic unit.

A source is not globally reliable or unreliable. The same record may strongly support one proposition while providing no direct support for another.

P-01 / SUPPORTEDA STOP command state was recorded at 14:03:22.480.
Trace basis
Controller event log / STOP_COMMAND = TRUE
Support boundary
Establishes a recorded command state. It does not establish physical stopping, successful intervention, or pre-ACP viability.
P-02 / NARROWEDThe interface service transmitted Warning W at 14:03:18.220.
Trace basis
Interface-server transmission record
Support boundary
Establishes transmission. It does not establish rendering, visual availability, human attention, reception, or comprehension.
P-03 / BOUNDEDActuation began no later than 14:03:21.100.
Trace basis
Actuator telemetry synchronized to the controller clock
Support boundary
Bounds actuation onset. It does not independently place the Actuation Commitment Point.
04 / PRIMARY OUTPUT

Execution Reconstruction Map

The ERM carries the supported sequence and its limits forward without converting uncertainty into confidence scores or analyst intuition.

P1Warning transmittedDirectly supported
P2Actuation beganDirectly supported
ACPBounded to t₁–t₂Exact placement unresolved
P3STOP state recordedPhysical effect unproven
UNRESOLVED CLAIM-RELEVANT RELATIONACP  ?  Operator input

The distinction matters to the governance claim. Qualified trace cannot resolve it at finer temporal resolution.

STOPPING BASISEvidentiary limit reached.

Further descent would outrun the qualified trace. The unresolved boundary passes to AEGIS intact.

05 / ADJACENT FUNCTIONS

Three questions. Three distinct analytical objects.

ArbiterSTG supplies theoretical background for post-execution trace discipline. VIRGIL and AEGIS perform separate functions in the applied workflow.

THEORETICAL LINEAGE

ArbiterSTG

What becomes trace? It diagnoses residue, trace eligibility, recruitment, and post-execution classification.

RECONSTRUCTION METHOD

VIRGIL

What can the trace support? It qualifies claim-relevant propositions and reconstructs the execution.

GOVERNANCE FRAMEWORK

AEGIS

What does the established execution support about governance? It evaluates the bounded governance claim.

METHOD BOUNDARY

VIRGIL turns qualified trace into a resolution-sensitive Execution Reconstruction Map: supported propositions, support boundaries, temporal relations, branches, unresolved distinctions, ACP placement or bounds, and an explicit stopping basis. AEGIS determines the governance attribution that reconstruction supports.

Carry qualified reconstruction into governance analysis.

Open the assessment workspace